New Slate Floor Oiling - Product Recipe
New Slate Floor Oiling
To nourish and protect a newly installed slate floor.
Step-by-Step Instructions
-
Lithofin Clean & Shine - Thoroughly clean the slate floor using a suitable cleaner to remove any dust, dirt, or residues. Rinse with clean water and allow the surface to dry completely.
Dilution: diluted as per product instructions · Wait: 1 hour · Coverage: 10-15 m²/L -
MN Slate-Oil - Apply the MN Slate-Oil evenly across the surface using a clean cloth or applicator. Ensure complete coverage and allow the oil to penetrate the stone for optimal nourishment and protection.
Dilution: undiluted · Wait: 30 minutes · Coverage: 10-15 m²/L -
Lithofin Buffing Pad - After the oil has penetrated, buff the surface with a clean, dry cloth or a buffing pad to remove any excess oil. Allow the floor to cure for at least 24 hours before heavy use.
Wait: 24 hours
Tips
- Ensure the slate is clean and dry before application.
- Use a soft cloth or applicator to avoid scratching the surface.
- Test the oil on a small, inconspicuous area first to ensure compatibility.
⚠️ Warnings
- Avoid walking on the surface until fully cured.
- Keep the area well-ventilated during application to prevent inhalation of fumes.
- Store the oil in a cool, dry place away from direct sunlight.
Expected Result
Nourished and protected slate floor.
Need help choosing the right products?
Use the LithoFinder wizard for personalised advice, or ask our AI chat assistant.