Concrete Interior polished concrete floor - Complete Care Guide

Concrete Interior polished concrete floor - Complete Care Guide

From installation to daily maintenance: everything you need to know

Initial Care (After Installation)

When: Within 1 week of installation, after the concrete has fully cured.

  1. Clean the new polished concrete surface with Lithofin MN Power-Clean diluted 1:10 to remove any installation residues.
  2. Allow the surface to dry completely (24-48 hours).
  3. Apply Lithofin MN Stain-Stop evenly with a soft cloth or applicator.
  4. Remove any excess product after 10-15 minutes.
  5. Allow 24 hours to cure before using the surface.

Products needed: Lithofin MN Power-Clean, Lithofin MN Stain-Stop

Daily Maintenance

Frequency: Daily or after each use

  1. Wipe the surface with a damp cloth using Lithofin MN Easy-Clean (spray) or MN Wash & Clean (diluted in water).
  2. Clean spills immediately to prevent staining, especially from oils, coffee, and acidic substances.
  3. Dry the surface after cleaning to prevent water marks.

Products: Lithofin MN Easy-Clean, Lithofin MN Wash & Clean

Do NOT:

  • Never use vinegar or lemon-based cleaners.
  • Never use abrasive sponges or steel wool.
  • Never use bleach or chlorine-based cleaners.
  • Avoid dragging heavy furniture across the surface to prevent scratches.

Periodic Deep Cleaning

Frequency: Every 1-3 months

  1. Apply Lithofin MN Power-Clean diluted 1:5 with a sponge across the surface.
  2. Leave the cleaner on for 5-10 minutes to penetrate.
  3. Gently scrub with a soft brush to remove dirt and grime.
  4. Rinse thoroughly with clean water to remove all residues.
  5. Dry the surface with a soft cloth.

Products: Lithofin MN Power-Clean

Protection & Sealing

Re-seal every: Every 1-2 years, or more frequently in high-traffic areas.

  1. Deep clean the surface first using Lithofin MN Power-Clean.
  2. Allow the surface to dry completely (24-48 hours).
  3. Apply Lithofin MN Stain-Stop evenly across the surface.
  4. Remove any excess after 10-15 minutes.
  5. Allow 24 hours to cure before heavy use.

Products: Lithofin MN Stain-Stop

Need specific product advice?

Use our Lithofinder to find the exact right product, or learn more about Concrete.